the top part of the tower is done, mounted and the lines connected. The 6 line run has been insulated and wrapped and Rylan helped my run it through a hole in the floor behind the cabinet. Its ready, and I drilled a hole in the fridge downstairs to prepare for running all the lines tomorrow. Tomorrow night I should be pulling beer from three taps. Now I need to order 3 more taps!
No comments:
Post a Comment